Top - picture from inside the building, showing the assembled trusses on the slab, the 1/4 of one truss raised into position (hard to see unless you know where to look, but it is in the center of the picture, adjacent to the Tower), and showing the A wall with all gables in place on the left side of the wall.
Middle - outside picture of wall A showing 5 of the 6 gables installed.
Bottom - showing the huge amount of lumber not yet consumed (10' 2x4, 14' 2x4, long 4x14 beams (connect the trusses and gables to form the roof), and varying length 2x6 to create joists and other things (talk to Craig for details). Not in the picture are countless other supplies stored in containers (ceiling tiles, lights, doors, windows, electrical wiring, sections of steal roofing material, ...)